The solution was to construct a panelized wall that I could completely finish in the shop and in one day install it at the job site and whala!!! instant wall.
![Picture](/uploads/1/0/2/0/10200590/968753.jpg)
The Floor slopes, the walls aren't plum or striaght, and the roof (ceiling) has a sag in it, what fun!
For this type of situation I use a small laser level that will cast perfectly vertical and horizontal lines, I use these lines s reference lines and take measurements from certian critical points to these lines . Then I can recreate these points in a CAD drawing and make my parts using My CAD drawing as a guide.
![Picture](/uploads/1/0/2/0/10200590/1223110.jpg)
6 hours on the job site, clean and no wet paint.